File Name |
Title |
Date |
Content List | Content List of LPMit Design Tips, Design Standard Forms (GCDs) and Deleted Design Technical Guidelines (DTGs) |
07.09.2020 |
LPMit-DT-01 | Stability of Top Soil on Rock Fill |
16.10.2018 |
LPMit-DT-02 | Contents of Stage 3 Report |
14.11.2019 |
LPMit-DT-03 | Tips for Design Groundwater | 13.8.2018 |
LPMit-DT-04 | Handover of Vegetation on Highways SIMAR Slopes |
13.8.2018 |
LPMit-DT-05 | Guidelines on Value Engineering Review of LPM Designs |
13.8.2018 |
LPMit-DT-06 | Site Supervision of Landscape Softworks, Establishment Works and Tree Preservation Works in LPM Contracts |
13.8.2018 |
LPMit-DT-07 | Installation of Reference Pins on Stabilized Slopes |
16.10.2018 |
LPMit-DT-08 | Tree Preservation for Slope Works |
13.8.2018 |
LPMit-DT-09 | Tips for LPMit Works in the Vicinity of Sensitive Structures |
13.8.2018 |
Supplementary Guidelines for Tree Risk Assessment Associated with Slope Works |
13.8.2018 |
|
LPMit-DT-11 | Tips for Stability Assessment of Man-made Slopes below Debris Resisting Barriers |
13.8.2018 |
Debris-resisting Barrier Structures - Ground Anchor Design |
07.09.2020 |